91桃色

The university provides notice of service interruption in the event of a planned or unexpected disruption in the facilities or services typically used by people with disabilities to access campus goods and services.聽

About service alerts and interruptions

Notices of service interruption include the reason for the disruption, the anticipated duration, a description of alternate facilities or services (if available), as well as accessible routes for making one鈥檚 way to these alternate facilities and services. The notice is placed in conspicuous campus locations and, when appropriate, on this site.

The University of Ottawa is proud to offer an inclusive environment to its entire community. We invite you to send us comments and suggestions on accessibility that will help us to keep on improving the level of accessibility campus-wide.  For more information on accessibility at the University of Ottawa, please visit the Accessibility Hub.

The Accessibility for Ontarians with Disabilities Act states that all employers must provide emergency response information in an accessible format to all employees with a disability that requires an accommodation. If an employee has an emergency response plan in place, please ensure that you revisit the emergency response plan with the employee in light of the temporary disruptions/maintenance. If an employee submits a new request for an accommodation due to a disability, the employee should discussion their request with their supervisor and/or the Human Resources Department.

If employees require advice on emergency preparedness or assistance with developing a personal emergency plan, they should inform their supervisor and/or the Human Resources Department. The Emergency Management Office may be consulted should subject matter expertise be required.

Active interruptions notices

Long term interruptions

Long term interruption notices are mostly due to construction projects on campus.

Campus-wide Interruption
Service affected: Courier Service: DHL shipping services is unavailable due to a strike.
Start of interruption: Mon, 06/09/2025 - 07:00
End of interruption: Unknown
Important note: This disruption may impactseveral incoming shipments from DHL. For outgoing shipments please use UPS or Canada post.
For more information, please contact: The Postal Service Team [email protected] 613-562-5800 ext. 6568

Alta Vista Campus 
Project: Construction of the Advanced Medical Research Centre
Project Manager: Sylviane Charette
Project Status: Active construction site
Alternative route: Not applicable for this project.
Related Interruption notices
Parking Lot H at RGN will close at midnight on May 10, 2024 and remain closed for the duration of construction (approx. October 2026).
Alternative parking is available for permit holders and visitors. View alternative options. 
When visiting the Alta vista campus, we strongly recommended using the 91桃色 inter-campus shuttle service
Loading dock will remain open during construction.

850 Peter Morand
Project: Automize Partitions Walls 122-123-124
Project Manager: Aliou Sow
Project Status: Active construction site
Anticipated construction completion date: March 6, 2025
Alternative route: Not applicable for this project.

Building affected: MNT - Montpetit - University 125
Shutdown details: There will be partial access to showers for male and female during the construction. Signage for pool access will be on site.  A few lockers will be affected, and the users will be informed by Sports Service. Notices for sauna access will be demonstrated on site by Sports Service.
Start of interruption: Wed, 02/26/2025 - 06:00
End of interruption: Fri, 07/18/2025 - 17:00
Impact: Partial access to showers, saunas, and lockers
Alternative route:  Not applicable for this shutdown
For more information, please contact: Dongxu Liu at [email protected]

Building affected: VNR - Vanier - Jean鈥怞acques Lussier 136 
Shutdown details: No access to room VNR 5080
Start of interruption: Wed, 05/28/2025 - 06:30
End of interruption: Mon, 07/14/2025 - 15:30
Impact: There will be more congestion in the elevators, corridors 5000C and 5000D. There will also be noise pollution.
Alternative route: Not applicable for this shutdown
Additional information: Some corridors will be covered with plastic protectors to ensure user safety.
For more information, please contact: Tresor Lukanzu Kapend at [email protected]

Building affected: DMS - Desmarais - Laurier 55 
Shutdown details: Entrance doors, north side will be closed for work.
Start of interruption: Mon, 05/12/2025 鈥 17:00
End of interruption: Tue, 08/12/2025 鈥 16:00
Impact: Users will need to use the entrance located at 55 Laurier Ave E.
Alternative route:  See map
For more information, please contact: Patrick Labr猫che at [email protected]

Garages - Parking Maintenance:
Mann Garage - Mon, 04/28/2025 to Fri, 08/22/2025
DMS Garage - Mon, 05/05/2025 to Fri, 08/22/2025
Hamelin/Simard Garage - Mon, 06/02/2025 to Thu, 07/17/2025
Shutdown details: We will carry out annual maintenance work to renew the parking lots.
Impact: There will be limited access to certain areas of the parking lots.
For more information, please contact: Dongxu Liu at [email protected]

Short term interruptions

Affected Areas: 100 Marie-Curie parking lot, loading zones and parking spaces in front of 141 Louis Pasteur.
Shutdown details : Parking Lot repairs
Start of interruption: Thu, 06/05/2025 - 08:00
End of interruption: Fri, 07/04/2025 - 17:00
Impact: Parking lots will be closed. See
Additional information: Access to the building will be maintained throughout the work. We ask that you drive carefully.
For more information, please contact:Dongxu Liu at [email protected]

Building affected:  SITE - ARC - MRN - DRO - CRG - CBY - GNN - BSC - LMX - FTX - MCE
Shutdown details: We will be cleaning the interior and exterior windows of the above buildings.
Start of interruption: Mon, 06/09/2025 - 07:00
End of interruption: Mon, 06/30/2025 - 17:00
Impact: Please remove objects from windowsills. 
For more information, please contact: Team RSS au [email protected].

Building affected: TBT - Tabaret - Cumberland 550 
Shutdown details: Grounds
Start of interruption: Wed, 06/11/2025  - 07:00
End of interruption: Wed, 07/02/2025 - 16:30
Impact: A team of technicians will be scanning the building鈥檚 structural elements (columns, floors and beams, etc.). Building will remain open.
Additional information: The team of technicians will mark out the areas they will be working on with barricades.
For more information, please contact: Adam Allard at [email protected]

Building affected: VNR - Vanier - Jean鈥怞acques Lussier 136 
Notice details: Ceiling Space Condition Assessment
Start of notice: Fri, 06/13/2025 - 07:00
End of notice: Thu, 06/19/2025 - 17:00
Impact: Users may have to leave the area or room for 15 to 30 minutes.
Additional information: An environmental consultant, together with an abatement contractor, will install pop-up enclosures in various areas of Vanier Hall to access the ceiling for a visual condition assessment. No other work will be conducted.
For more information, please contact: Philippe Millette at [email protected]

Building affected: SMD - Simard - University 60 
Notice details: Ceiling Space Condition Assessment
Start of Notice: Wed, 06/18/2025 - 12:00
End of Notice: Mon, 06/23/2025 - 17:00
Impact: Users may have to leave the area or room for 15 to 30 minutes.
Additional information: An environmental consultant, together with an abatement contractor, will install pop-up enclosures in various areas of Simard Hall to access the ceiling for a visual condition assessment. No other work will be conducted.
For more information, please contact: Philippe Millette at [email protected]

Building affected: TBT - Tabaret - Cumberland 550 
Shutdown details: Complete electrical interruption
Start of interruption: Thu, 06/19/2025 - 04:30
End of interruption: Thu, 06/19/2025 - 07:00                              
Impact: During the shut down period, there will be no regular power. Emergency power will remain.
Additional information: There will be no electricity in the entire building during the shutdown. The shutdown will not affect emergency power.
For more information, please contact: Philippe Millette at [email protected]a

Building affected: MNO - Minto Sports Complex - King Edward 801
Shutdown details: We will be shutting down the emergency power circuits.
Start of interruption: Thu, 06/19/2025 - 06:00
End of interruption: Thu, 06/19/2025 - 08:00
Impact: The gymnasium turnstile will not have any power, as well as the fridge in the clinic in room 203L. 
For more information, please contact: Jean-Fran莽ois Duval at [email protected]

Building affected:  ARC - Advanced Research Complex - Templeton 25
Shutdown details: Normal power circuits will be closeto facilitate the installation of new outlets. Emergency power circuits will not be affected.
Start of interruption: Thu, 06/19/2025 - 05:00
End of interruption: Thu, 06/19/2025 - 11:00
Impact: The labs in rooms 444, 447, and 448 will have no power during the shutdown.
For more information, please contact: Devin McGirr at [email protected].

Building affected: ARC - Advanced Research Complex - Templeton 25
Shutdown details: We will close the normal power circuits will be close. Emergency power circuits will not be affected.
Start of interruption: Thu, 06/19/2025 - 06:00
End of interruption: Thu, 06/19/2025 - 12:00
Impact: The lab in room 444 will have no power during the shutdown.
For more information, please contact: Guillaume Blais at [email protected].

Building affected: MRT - Morisset - University 65
Shutdown details: Emergency power shutdown
Start of interruption: Fri, 06/20/2025 - 03:00
End of interruption: Fri, 06/20/2025 - 07:00
Impact: This shutdown will affect emergency power outlets in rooms 0020, 0021, 022 and 0046. Emergency lighting, exit lights and the fire alarm panel will be affected. Similarly, the 5 elevators will be out of service during the work.
For more information, please contact: Martin Faubert at [email protected]

Building affected: FTX - Fauteux - Louis Pasteur 57
Shutdown details: Water shutdown
Start of interruption: Fri, 06/20/2025 - 06:00
End of interruption: Fri, 06/20/2025 - 12:00
Impact: Full building shutdown. There will be no access to running water, which means washrooms, sinks, and any equipment relying on water will be temporarily out of service.
For more information, please contact: Philippe Millette at [email protected]

Building affected:  BRS - Brooks Garage - Thomas-More 100
Shutdown details: We will be repairing the ceiling in the entrance side of the access ramp to the Brooks garage.
Start of interruption: Fri, 06/20/2025 - 09:00
End of interruption: Fri, 06/20/2025 - 15:00
Impact: Workers will be present to redirect vehicles safely around the work area to enter and exit the underground parking lot.
For more information, please contact: Justin Champagne au [email protected].

Building affected:  ARC - Advanced Research Complex - Templeton 25
Shutdown details: The normal power circuits will be closed. Emergency power circuits will not be affected.
Start of interruption: Tue, 06/24/2025 - 06:00
End of interruption: Tue, 06/24/2025 - 11:00
Impact: All equipment in room 447 and 448 will not have power during the hours above to facilitate the installations of new outlets.
For more information, please contact: Guillaume Blais at [email protected].

Building affected:  CRG - Bioscience鈥怭h I,CAREG - Marie Curie 20
Shutdown details: The normal power circuits will be closed. Emergency power circuits will not be affected.
Start of interruption: Tue, 06/24/2025 - 07:00
End of interruption: Tue, 06/24/2025 - 09:00
Impact: There will be no power in room 417 for an electric installation.
For more information, please contact: Guillaume Blais at [email protected].

Floor Maintenance:
DMS - Desmarais (Laurier 55): Sun, 06/01/2025 to Sun, 06/30/2025 
ARC - Advanced Research Complex (Templeton 25): Tue, 06/03/2025 to Fri, 06/20/2025
RGN - Roger Guindon (Smyth 451): Thu, 06/12/2025 to Sat, 06/21/2025
MNT - Montpetit (University 125): Thu, 06/12/2025 to Fri, 06/27/2025
LRR - Laurier - (Laurier 100): Wed, 06/18/2025 to Wed, 06/25/2025 
BRS - Brooks (Thomas鈥怣ore 100): Wed, 06/18/2025 to Fri, 06/27/2025
TBT - Tabaret (Cumberland 550): Wed, 06/18/2025 to Fri, 06/27/2025
MHN - Hamelin (Laurier 70): Wed, 06/18/2025 to Fri, 06/27/2025
MRT - Morisset (University 65): Wed, 06/18/2025 to Fri, 06/27/2025
DMS - Desmarais (Laurier 55): Sun, 06/22/2025 to Thu, 07/17/2025 
PRZ - P茅rez (University 50): Tue, 06/24/2025 to Fri, 06/27/2025 
BSC - Bioscience鈥怭h II (Marie Curie 30): Sun, 06/29/2025 to Tue, 07/22/2025 
600 - King Edward (600 King Edward Avenue): Mon 06/30/2025 to Fri 07/11/2025
HGN - Hagen (S茅raphin Marion 115): Sun, 07/20/2025 to Fri, 07/25/2025 
SMN - Academic Hall (S茅raphin Marion 133鈥135): Sun, 07/27/2025 to Fri, 08/01/2025 
Impact: The premises will not be accessible from 23:00 to 07:00. Work may last up to two days. There will be no impact on access to the building during the day.
Additional information: Please remove all personal belongings from the floor. A slight chemical odor may be present in the air for the first 48 hours following maintenance.
For more information, please contact: Team RSS at [email protected].

Window Cleaning:
CRG - CAREG鈥怭h I (Marie Curie 20): Outdoor: Week of 06/23/25 Indoor: Week of 07/14/25
CBY - Colonel By Hall (161 Louis Pasteur): Outdoor: Week of 06/23/25 Indoor: Week of 07/14/25
BSC - Biosciences-Ph II (Marie Curie 30): Outdoor: Week of 06/30/25 Indoor: Week of 07/21/25
CRX - Learning Crosswords (145 Jean-Jacques Lussier): Outdoor: Week of 07/07/25 Indoor: Week of 07/07/25
UCU - University Center (85 University): Outdoor: Week of 07/07/25 Indoor: Week of 07/14/25
VNR - Vanier Hall (136 Jean-Jacques Lussier): Outdoor: Week of 07/07/25 Indoor: Week of 07/14/25
LMX - Lamoureux Hall (145 Jean-Jacques Lussier): Outdoor: Week of 07/14/25 Indoor: Week of 06/23/25
MNT - Montpetit Hall (125 University): Outdoor: Week of 07/14/25 Indoor: Week of 07/07/25
FTX - Fauteux Hall (57 Louis-Pasteur Private): Outdoor: Week of 07/14/25 Indoor: Week of 06/30/25
LEE - Block A & E (200 Lees): Outdoor: Week of 07/14/25 Indoor: Week of 07/14/25
MRT - Morisset Library (65 University Private): Outdoor: Week of 07/21/25 Indoor: Week of 07/14/25
PRZ - P茅rez Hall (50 University Private): Outdoor: Week of 07/21/25 Indoor: Week of 07/28/25
SMD - Simard Hall (60 University): Outdoor: Week of 07/21/25 Indoor: Week of 07/21/25
LRR - 100 Laurier (100 Laurier Avenue East): Outdoor: Week of 07/21/25 Indoor: Week of 07/21/25
DMS - Desmarais Hall (55 Laurier Avenue): Outdoor: Week of 07/21/25 Indoor: Week of 08/04/25
STM - STEM Complex (150 Louis Pasteur Private): Outdoor: Week of 07/21/25 Indoor: Week of 07/14/25
100 Thomas More: Outdoor: Week of 07/21/25 Indoor: Week of 08/11/25
MCE - 100 Marie-Curie (100 Marie Curie Private): Outdoor: Week of 07/21/25 Indoor: Week of 06/23/25 
FHS - Faculty of Health Sciences (200 Lees Avenue):Outdoor: Week of 07/21/25 Indoor: Week of 07/21/25
115-133-135 S茅raphin-Marion: Outdoor: Week of 07/28/25 Indoor: Week of 07/07/25
FSS - Social Sciences Building (120 University Private): Outdoor: Week of 08/04/25 Indoor: Week of 07/21/25
TBT - Tabaret Hall (550 Cumberland): Outdoor: Week of 08/04/25 Indoor: Week of 07/28/25
Shutdown details: We will be cleaning the interior and exterior windows of the above buildings between 06:00 - 16:00.
Impact: Please remove objects from windowsills. There might be a faint chemical odor in the air for the first 48 hours after maintenance. 
For more information, please contact: Team RSS au [email protected]

Elevator and lift interruptions

Affected location: 012 PRZ - Perez
Elevator #: P1
Anticipated date of service restoration: July 11
Alternative: See alternative route options.
For assistance, please contact 613-562-5499

Affected location: 726 ANX - Annex Residence
Elevator #: 2
Anticipated date of service restoration: June 20
Alternative: Additional elevators available on-site.

Affected location: 153 ARC - Advanced Research Complex
Elevator #: P1
Anticipated date of service restoration: June 20
Alternative: Additional elevators available on-site.

Affected location: 013 RCR  
Elevator #: 2
Anticipated date of service restoration: June 20